RS-39 daily summary

Today, work was continued with the SC “Chibis-M”. In the period from Jan 26 23:00 am to Jan 27 11:00 pm J four sessions were conducted with ground control station in Krasnoyarsk and 5 sessions with ground control in Kaluga.

Past sessions allow us to conclude that the main parameters of the microsatellite are normal. During the chat sessions were the following parameters on-board systems:

– The voltage onboard network 13.2V-15V
– Current on-board network 0.48A – 2.72A
– The temperature on board the vehicle from 0 to 28 degrees Celsius

Parameters within acceptable values.

Was continued for configuring the system and stabilize the orientation of the spacecraft, in particular algorithm is enabled to maintain solar orientation. According to information received telemetry data confirmed that the unit is currently sorietirovan solar panels to the sun and has a small rotation around this axis.

Transfer of technology telemetry in Morse code was resumed today at 00:30 Moscow time and will continue until 16:30. Today’s reports of reception of the satellite signal received from Malta, Italy, France, USA, Argentina, India and Japan.

The next session is scheduled with the spacecraft on Jan 27 22:01:41 UTC.

http://chibis.cosmos.ru/

Leave a Reply